solarpanelsforindustrialunits

Industrial unit solar in the East Midlands: grid, planning and tax

Solar on an industrial unit in the East Midlands follows the English rules, with three local specifics. National Grid Electricity Distribution connects much of the region. PVGIS puts a south-facing roof at about 880 to 920 kWh per kWp a year. The Freeport tax allowance applies only inside three named tax sites.

This page is for landlords, managing agents and tenants of units in Nottingham, Leicester, Derby, Lincoln, Northampton and the places between. It sets out what is specific to the region; the lease, consent and tax rules are the same as anywhere in England and are covered in the guide to solar panels on a rented industrial unit.

What is specific to the East Midlands

PointWhat applies
Network operatorNational Grid Electricity Distribution (East Midlands) is the operator for much of the region. Its connections hub describes a G98 notification, no later than 28 days after commissioning, for installations up to 16 A per phase, a standard G99 application above that, and a fast-track G99 route for some eligible small installations.
FreeportThe East Midlands Freeport has three tax sites: East Midlands Gateway and Industrial Cluster (EMAGIC), East Midlands Intermodal Park (EMIP) and Ratcliffe on Soar, designated from 22 March 2022 (SI 2022/184). The Freeport capital allowance applies only to qualifying plant used inside a tax site (GOV.UK Freeports), so a unit elsewhere in the region does not qualify.
Planning and ratesThe region is in England: Class J of Part 14 applies, with prior approval above the 50 kW microgeneration scale, and the England-only business-rates exclusion for solar generating plant runs to 31 March 2035 (SI 2022/405).
Council targetsNottingham City Council targets carbon neutral by 2028 (CN28 review); Derby City Council targets net zero for its own emissions by 2035 (climate action plan); Leicestershire County Council targets net zero for its own operations by 2030 (net zero action plan). These are the councils’ own targets.

What a roof generates, place by place

These figures come from the European Commission’s PVGIS tool (version 5.2, SARAH2 radiation data) for 1 kWp of crystalline silicon panels at a 10 degree tilt facing south, with 14% system losses. A different tilt, direction or shading changes them.

PlaceYearly output per kWp
Nottingham883 kWh
Derby884 kWh
Leicester897 kWh
Lincoln909 kWh
Northampton919 kWh

Where to start

If your unit is in or near Nottingham or Leicester, the local notes are on the Nottingham industrial units and Leicester industrial units pages. For who pays and who claims the tax allowances, see grants and funding. Derby, Lincoln and Northampton units use the same England rules and the figures above.

Can our unit have solar?

We reply by email

A few quick answers show the consent route, who claims, the planning route and the grid threshold for your unit. Send them if you want a reply by email. This is information, not a quote.

By submitting you agree to our privacy policy. We never sell your details.

FAQS

East Midlands questions

Who connects an industrial unit’s solar in the East Midlands?

For much of the region it is National Grid Electricity Distribution (East Midlands). Its connections hub says a G98 notification (no later than 28 days after commissioning) covers small installations up to 16 A per phase, a standard G99 application is needed above that, and a fast-track G99 route exists for some eligible small installations. Confirm the operator for your own address before design starts.

Does the East Midlands Freeport help a unit that is not on a tax site?

No. The allowance applies only to plant used inside a designated tax site. The East Midlands Freeport has three tax sites: East Midlands Gateway and Industrial Cluster, East Midlands Intermodal Park and Ratcliffe on Soar. A building elsewhere in the region, even close by, does not qualify.

How much does a roof in the East Midlands generate?

PVGIS gives about 880 to 920 kWh a year for each kWp, for a south-facing 10 degree roof. That is for five places in the region at the same assumptions (14% system losses). Your own roof’s tilt, direction and shading change it, and so does the system size, so treat the figure as a starting point.

Is planning permission needed for solar on an industrial unit in the East Midlands?

Often not. The region is in England, where Class J of Part 14 covers solar PV on non-domestic buildings. Arrays above the 50 kW microgeneration scale need prior approval from the council on design and external appearance, and listed buildings and scheduled monuments are excluded.

What happens when I send my details?

We reply by email. Your answers go to SEO Dons Ltd, the publisher of this guide. We are not an installer, and this page does not give a quote or a saving. We never sell your details.

Sources

Last verified 11 November 2026. General information, not legal or tax advice.

Send an enquiry
Get a free quote